You don't have javascript enabled. Good luck with that.
Pencarian
sumur resapan jakarta dok bj

200 Absorption Wells to Be Built in West Jakarta

Jakarta Provincial Government will build 200 absorption wells in West Jakarta this year. Besides functioning as backup water storages, the wells are also effective in minimizing flood.

Absorption wells can restore groundwater quality, thus it can be used in dry season. Moreover, the wells can also minimize the impact of flooding

“To build absorption wells, 200 bio pore equipments will be prepared in each sub-district and urban village,” stated Head of Natural Resource Damage Handling for West Jakarta Environment Office (KLH), Askot Pardede, Friday (4/25).

According to Pardede, the absorption well’s water can be utilized to meet citizens’ needs during dry season. While in rainy season, the well is able to minimize the impact of flooding.

Groundwater in 3 Sub-Districts in West Jakarta Contaminated

“Absorption wells can restore groundwater quality, thus it can be used in dry season. Moreover, the wells can also minimize the impact of flooding,” he told.

In accordance to Governor Regulation No. 115/2001 about Absorption Well Construction, added Pardede, requirements has been set for absorption well construction in building area, in which the drainage towards the well is separated from the water channel.

“Absorption well must be built in a place that has stable soil structure and in off-site waste landfill,” he uttered.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye517 personTiyo Surya Sakti
  3. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye430 personFakhrizal Fakhri
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye373 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye363 personAldi Geri Lumban Tobing
close